The 2-Minute Rule for Cast in Situ Piles in Bangladesh
The 25mm thick significant steel tube is pushed with the close closed by a metal shoe. On achieving the necessary driving resistance, a complete length cage is lowered in to the tube and filled with superior slump concrete. The tube is then vibrated out leaving a shaft of concrete.Wherever applicable, the paper considers the impact of response pile